الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
Chillers Monthly Routine work Operation and Maintenance
Check and Record
1. Oil filter cleaning oil pump function and current
2. Purge Unit filter cleaning. For under pressure refrigerants
3. Check: Relief Valves, rupture discs for leaks
4. Test: Operation and safety cutouts, automatic controls and
automatic devices for correct operation
5. Test: all gauges for correct reading – calibrate if necessary
6. Visually inspect capillary tubes for pinching or damage for
thermostat and pressure switches
Lubricate: as recommended by Manufacturer
1. Vane Linkage
2. Motor Assembly
3. Air compressor if there is pneumatic control
4. Inspect and clean the electrical panels and electrical connections
5. Top-up thermometer pockets with oil
في أمان الله