1. This site uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.

Chillers Monthly Routine work Operation and Maintenance

Discussion in 'المنتدى التعليمي' started by mannan, 12/12/16.

  1. mannan

    mannan Administrator Staff Member


    [​IMG]

    [​IMG]


    الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


    Chillers Monthly Routine work Operation and Maintenance

    [​IMG]

    Check and Record

    1. Oil filter cleaning oil pump function and current

    2. Purge Unit filter cleaning. For under pressure refrigerants

    3. Check: Relief Valves, rupture discs for leaks

    4. Test: Operation and safety cutouts, automatic controls and
    automatic devices for correct operation

    5. Test: all gauges for correct reading – calibrate if necessary

    6. Visually inspect capillary tubes for pinching or damage for
    thermostat and pressure switches

    Lubricate: as recommended by Manufacturer

    1. Vane Linkage

    2. Motor Assembly

    3. Air compressor if there is pneumatic control

    4. Inspect and clean the electrical panels and electrical connections

    5. Top-up thermometer pockets with oil

    في أمان الله


    [​IMG]

     

Share This Page