Free Virtual Router software
Free Virtual Router software

Water Treatment Units Work Operation and Maintenance

[​IMG]

[​IMG]

الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين

Water Treatment Units Work Operation and Maintenance

[​IMG]

EQUIPMENT: Water Treatment Units

Daily Routine work

1. Check and record: Reading in the instruments
2. Check chemical levels in drum

Weekly Routine work

1. Strainer cleaning
2. Re-adjust metering pumps and bleeding system according to the requirements of laboratory

Monthly Routine work

1. Dosing pumps “Metering Pumps”: Cleaning the heads, suction and injection parts
2. Conductivity cell cleaning
3. Re-calibrate the Measuring Instruments by using the testing Kit for measuring the treated water

Annually Routine Work

1. Clean and paint
2. Dis-assemble pumps and repair or replace if necessary
3. Calibrate and repair the measuring instruments

Note: The work should also include any other routines recommended by manufacturer

في أمان الله

[​IMG]

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.