Free Virtual Router software
Free Virtual Router software

PUMPS Work Operation and Maintenance


[​IMG]

[​IMG]

الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين

PUMPS Work Operation and Maintenance

[​IMG]

EQUIPMENT: – PUMPS

Daily Routine Work

1. Check and Record

Suction and discharge pressures, Motor voltage and current water flow rate

2. Check: gland leakage, Motor temperature by feeling with hand

3. Inspect for undue noise or vibration and any evidence of water leakage

Weekly Routine Work

1. Operate suction and discharge valves to ensure free travel and lubricate spindles
2. Check lubrication of shaft bearings
3. Check for even working hours and change over as necessary
4. Check mechanical seals for leakage

Monthly Routine work

1.Clean strainers
2.Change bearing oil and / or grease the pump bearing
3.Drain pump casing if applicable

During Shut Down Season

1. All pumps and valves to be stripped, inspected
all worn parts including Mechanical seal/gland packing to be replaced
2. Inspect shaft and bearing and replace bearing if necessary
3. Check alignment of motor and pump
4. Check motor bearing and replace if necessary, check motor insulation
5. Tighten all bolts
6. Check the strainers
7. Replace rubber bushing
8. Paint the pump

Note: The work should also include any other routines recommended by manufacturer

في أمان الله

[​IMG]

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.