COOLING TOWERS Weekly Routine Work Operation and Maintenance
A) Check and Record
1. Clean the strainers and check make-up water. Clean spray nozzles
2. Lubricate fan and motor bearings.
3. Check oil level in the gearbox –Top-up if necessary.
4. Take samples of water from cooling towers to the Laboratory whose
analysis and recommendations shall be kept on file
Based on said recommendations for chemical dosing and blow down
5. Check chemical injection system and automatic blow down system for correct operation
top up chemical dosing tanks as necessaryفي أمان الله