Free Virtual Router software
Free Virtual Router software

Chillers Weekly Routine work Operation and Maintenance

[​IMG]

[​IMG]

الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين

Chillers Weekly Routine work Operation and Maintenance

[​IMG]

Check and Record

1. Refrigerant level & Oil level Controller also refrigerant loss

2. Operation of chemical injection system

3. Inspect: for traces of oil on joints and flanges

4. Take samples of water from chilled water system and
condenser Water System to Laboratory whose analysis and
recommendations shall be kept on file in the Engineer’s
Office. Based on said recommendations, the engineer will
instruct the contractor accordingly. Such instructions for
chemical dosing and blow down shall be strictly adhered to

5. Check Chillers for even working hours, changeover if necessary

6. Check oil heater cut-in / cut-out

في أمان الله

[​IMG]

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.