Daily Archives: February 10, 2017

2 posts

Fan Coil Units F.C.U. Work Operation and Maintenance

Fan Coil Units F.C.U. Work Operation and Maintenance

الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين Fan Coil Units F.C.U. Work Operation and Maintenance Equipment: Fan Coil Units F.C.U. Daily Routine Work Check and Record 1. Check undue noise or vibration and any evidence of water leakage 2. Check condensate drain line for blockage 2W.Routine […]

AIR HANDLING UNITS Work Operation and Maintenance

AIR HANDLING UNITS Work Operation and Maintenance

الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين AIR HANDLING UNITS Work Operation and Maintenance EQUIPMENT : AIR HANDLING UNITS Daily Routine Work 1. Check & Record: Inlet and outlet temperature and pressure of chilled water air temperature: re-circulation and flow, room thermostat setting, Motor: voltage and […]